Multifamily
Full-division estimate
Documents
Architectural, structural, civil and MEP drawings
Possible output
CSI workbook, marked plans, basis of estimate and alternates
Texas construction estimating · Scope, fee and delivery confirmed in writing
Representative scopes
These are illustrative scope examples, not claims about completed client projects. They show the document set, review focus and output a contractor could request for common Texas project types.
Actual deliverables, pricing sources and estimate class are defined from the documents supplied and confirmed in the proposal.
Multifamily
Architectural, structural, civil and MEP drawings
CSI workbook, marked plans, basis of estimate and alternates
Industrial
Site, structural and process drawings plus equipment schedules
Quantities by system, pricing basis, exclusions and scope questions
Data center
Model or drawings, one-lines, equipment schedules and phasing
Element quantities, long-lead flags and phase-level cost structure
Healthcare
Coordinated floor plans, details, specifications and schedules
System takeoffs, fixture and equipment counts, marked plan references
Tilt-wall warehouse
Civil, geotechnical, structural and panel drawings
Earthwork, foundation, panel and steel quantities with assumptions
Conceptual development
Program, site information and available schematic documents
Parametric budget, stated assumptions, contingency and escalation basis
Need to review a sample format for your scope? Request an available sample by email.
Reading the project examples
The examples above are illustrative scope scenarios, not verified completed-project claims. They show how document maturity, trade interfaces and the intended decision change the estimating deliverable across building types.
A multifamily hard bid may require repetitive unit takeoffs, finish schedules, alternates and subcontractor coverage. An industrial estimate may contain less building area but more equipment interfaces, piping, structural support and site logistics. A conceptual data-center budget needs clear allowances and escalation because design decisions are still moving.
The estimate basis should identify available information and unresolved assumptions. Scope maturity and a separate risk assessment help explain why an early planning budget should not be treated as a completed hard-bid estimate.
Measured quantities are spot-checked and compared with relevant benchmarks. Pricing is reviewed against the selected Texas market and any available supplier or subcontractor information. Before delivery, exclusions, assumptions, alternates and known document gaps are confirmed in the basis of estimate.